濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢(xún)電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.syaan.cn/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

鋼筋加工棚搭建要注意什么?

來(lái)源:http://m.syaan.cn/   發(fā)布時(shí)間:2024-01-08

鋼筋加工棚主要用于路途、修建、橋梁工地施工上,一聽(tīng)名字就知道是用于鋼筋加工零件所建的一個(gè)防護(hù)棚,能夠用來(lái)遮雨避陽(yáng),使工人在氣候條件不允許的情況下進(jìn)行作業(yè)生產(chǎn)。

The steel bar processing shed is mainly used for road, construction, and bridge construction sites. The name suggests that it is a protective shed built for steel bar processing parts, which can be used to shelter from rain and sunlight, allowing workers to carry out work and production in weather conditions that do not allow.

鋼筋加工棚常用的尺度有兩種,一種是寬4000*長(zhǎng)6000*高3500㎜,另一種是寬6000*長(zhǎng)9000*高3500mm,鋼筋加工棚的結(jié)構(gòu)分為立柱、橫梁、雙層龍骨,氟碳涂層彩鋼板,防砸木板5大類(lèi),這些大類(lèi)拼裝出一整套的鋼筋加工棚,連接方法。運(yùn)用鍍鋅緊固件,按照?qǐng)D紙量好場(chǎng)所尺度后先垂立立柱,立柱設(shè)備結(jié)束后在立柱前端設(shè)備橫梁,等設(shè)備好橫梁后依據(jù)圖紙量好龍骨尺度散布設(shè)備,這一步完成后直接設(shè)備防砸模板,終究一步便是氟碳涂層彩鋼板的設(shè)備。

There are two commonly used dimensions for steel bar processing sheds. One is 4000 mm wide * 6000 mm long * 3500mm high, and the other is 6000 mm wide * 9000 mm long * 3500mm high. The structure of the steel bar processing shed is divided into five categories: columns, crossbeams, double-layer keels, fluorocarbon coated color steel plates, and anti impact wooden boards. These categories assemble a complete set of steel bar processing sheds and their connection methods. Using galvanized fasteners, after measuring the site scale according to the drawing, the column is first erected. After the column equipment is completed, the crossbeam is installed at the front end of the column. After the crossbeam is installed, the keel scale is measured according to the drawing to spread the equipment. After this step is completed, the anti smashing template is directly installed, and the final step is to use fluorocarbon coated color steel plate equipment.

看似設(shè)備麻煩,實(shí)則設(shè)備簡(jiǎn)略,運(yùn)送便利,是工地鋼筋防護(hù)棚的挑選,鋼筋加工棚和鋼管防護(hù)棚的比照:鋼筋加工棚符合出產(chǎn)標(biāo)準(zhǔn)化要求,定型組裝和設(shè)備,配色,結(jié)構(gòu),可達(dá)到標(biāo)準(zhǔn)化要求。

Although the equipment may seem complicated, in reality, it is simple and easy to transport. It is the selection of steel reinforcement protection sheds for construction sites. The comparison between steel reinforcement processing sheds and steel pipe protection sheds: the steel reinforcement processing shed meets the standardized requirements for safe production, with standardized assembly and equipment, color matching, and structural safety, which can meet the standardized requirements.

鋼筋加工棚選用規(guī)范不銹鋼板材制做,兩層防墜構(gòu)造,結(jié)實(shí)用,規(guī)范化設(shè)計(jì)方案,全組裝式,快組裝,拆裝簡(jiǎn)易,運(yùn)送。伴隨著市場(chǎng)經(jīng)濟(jì)體制的發(fā)展趨勢(shì),修建工程施工公司遭遇著強(qiáng)烈的市場(chǎng)需求。怎樣打造出平穩(wěn),美觀大方的文明行為施工工地是各個(gè)施工工地需要應(yīng)對(duì)的難點(diǎn),施工工地鋼筋加工棚是修建工程施工平穩(wěn)管理方法為要害的一環(huán)。

20220330052444906.jpg

The steel processing shed is made of standard stainless steel plates, with a two-layer anti fall structure, practical structure, standardized design scheme, fully assembled, fast assembly, easy disassembly and transportation. With the development trend of the market economy system, construction companies are facing strong market demand. How to create a stable, aesthetically pleasing and civilized construction site is a difficult point that each construction site needs to deal with. The steel processing shed on the construction site is a crucial part of the smooth management method for construction projects.

鋼筋加工棚應(yīng)怎樣設(shè)置?

How to set up a steel processing shed?

1、各種防護(hù)棚應(yīng)該有單的模板支撐體系,固定不動(dòng)平穩(wěn)。制止用竹子搭設(shè),且不行懸挑腳手架在外面架子上;

1. Various protective sheds should have a single template support system that is fixed and stable. Prohibit the use of bamboo for construction, and do not hang scaffolding on external shelves;

2、收支房屋修建行為主體通道口應(yīng)搭設(shè)防護(hù)棚。棚寬闊于道閘,兩邊各長(zhǎng)出1m,凈寬規(guī)格應(yīng)合乎高空作業(yè)平穩(wěn)防護(hù)區(qū)域。掉落半徑(R)各自為:當(dāng)下跌物高度為2~5m時(shí),R為3m;當(dāng)下跌物高度為5~15m時(shí),R為4m;當(dāng)下跌物高度為15~30m時(shí),R為5m;當(dāng)下跌物高度超過(guò)30m時(shí),R為6m;

2. The main body of the income and expenditure housing construction behavior should set up protective sheds at the safety passage entrance. The shed is wider than the gate, with a length of 1m on each side. The net width specification should comply with the safe and stable protection area for high-altitude operations. The falling radii (R) are: when the height of the falling object is 2-5m, R is 3m; When the height of the falling object is 5-15m, R is 4m; When the height of the falling object is 15-30m, R is 5m; When the height of the falling object exceeds 30m, R is 6m;

3、木匠加工場(chǎng)所、修建鋼筋加工場(chǎng)所等上邊有可能下跌物品或處在起重設(shè)備調(diào)桿旋轉(zhuǎn)區(qū)域以?xún)?nèi),應(yīng)搭設(shè)兩層防護(hù)棚;

3. Two layers of protective sheds should be erected on carpenter processing sites, steel reinforcement processing sites, and other areas where objects may fall or are within the rotating area of lifting equipment adjustment rods;

4、非通道口應(yīng)設(shè)定禁行標(biāo)志,制止收支。

4. Non safe passage entrances should be marked with no traffic signs to prevent income and expenditure.

5、平穩(wěn)防護(hù)棚應(yīng)選用兩層保護(hù)措施,當(dāng)選用腳板口腔上皮細(xì)胞,層間隔600mm,鋪裝方位應(yīng)相互垂直;

5. A stable protective shed should be equipped with two layers of protective measures. When using foot board oral epithelial cells, the layer spacing should be 600mm, and the paving direction should be perpendicular to each other;

6、內(nèi)場(chǎng)(外)路面邊框線與房屋修建(或外腳手架)邊緣間距各自低于掉落半徑的,應(yīng)搭設(shè)平穩(wěn)通道。

6. If the distance between the boundary line of the inner (outer) road surface and the edge of the building construction (or outer scaffolding) is lower than the falling radius, a stable and safe passage should be erected.