基坑圍欄的制作工藝
來(lái)源:http://m.syaan.cn/ 發(fā)布時(shí)間:2021-10-26
先篩選材料并采購(gòu)(盤(pán)條、鐵絲、管材)——進(jìn)廠檢驗(yàn)---調(diào)試機(jī)器和網(wǎng)片生產(chǎn)---檢驗(yàn)與大貨的過(guò)程檢驗(yàn)---胎具制作、框架下料與焊接---檢驗(yàn)與過(guò)程檢驗(yàn)----網(wǎng)片與框架的連(焊)接--檢驗(yàn)與過(guò)程檢驗(yàn)---立柱下料、折彎成型、邊耳焊接---檢驗(yàn)與過(guò)程檢驗(yàn)---配套安裝檢驗(yàn)---電鍍鋅或熱鍍鋅處理及檢驗(yàn)---浸塑處理及檢驗(yàn)---成品抽檢或全檢檢驗(yàn)---入庫(kù)倉(cāng)儲(chǔ)----運(yùn)輸。
First select materials and purchase (wire rod, iron wire and pipe) - incoming inspection - commissioning machine and mesh production - Inspection and process inspection of large goods - mould production, frame blanking and welding - Inspection and process inspection - connection (welding) between mesh and frame - Inspection and process inspection - column blanking, bending and forming Lug welding - Inspection and process inspection - supporting installation inspection - electro galvanizing or hot galvanizing treatment and inspection - plastic dipping treatment and inspection - sampling inspection or full inspection of finished products - warehousing - transportation.
陜西基坑圍欄
Shaanxi foundation pit fence
基坑圍欄電鍍鋅工藝:網(wǎng)片電鍍前的檢驗(yàn)→除銹→水洗→氧化→鍍鋅→鈍化→清洗--晾干→檢驗(yàn)
Electro galvanizing process of foundation pit fence: inspection before mesh electroplating → rust removal → water washing → oxidation → galvanizing → passivation → cleaning - drying → inspection
基坑圍欄熱鍍鋅工藝:網(wǎng)片熱鍍鋅前的檢驗(yàn)→脫脂→水洗→酸洗---水洗→浸注鍍?nèi)芤?rarr;烘干預(yù)熱→熱鍍鋅→整理冷卻→鈍化→漂洗→干燥→檢驗(yàn)
Hot dip galvanizing process of foundation pit fence: inspection before hot dip galvanizing of mesh → degreasing → water washing → Pickling - water washing → dipping plating solution → drying and preheating → hot dip galvanizing → finishing and cooling → passivation → rinsing → drying → inspection
基坑圍欄浸塑工藝:網(wǎng)片浸塑前的檢驗(yàn)—除油打砂—預(yù)熱—浸塑—吊掛入倉(cāng)—烘干溜平—檢驗(yàn)—成品入庫(kù)清點(diǎn)—出庫(kù)運(yùn)輸
Plastic dipping process of foundation pit fence: inspection before plastic dipping of mesh - degreasing and sanding - preheating - plastic dipping - hanging into warehouse - drying and smoothing - Inspection - warehousing and counting of finished products - outbound transportation
基坑圍欄網(wǎng)片焊接工藝:采購(gòu)盤(pán)條或鐵絲—-驗(yàn)證材質(zhì)---大拔、冷拔絲經(jīng)的抽檢—-校直截?cái)嗉敖z徑隨時(shí)測(cè)量-—調(diào)機(jī)試生產(chǎn)并經(jīng)檢驗(yàn)片網(wǎng)--—批量生產(chǎn)和過(guò)程檢驗(yàn)--—網(wǎng)片抽檢
Welding process of foundation pit fence mesh: purchase wire rod or iron wire - verify the material - Sampling Inspection of large drawn and cold drawn wires - straightening and cutting and measuring the wire diameter at any time - adjust the machine for trial production and pass the inspection mesh - batch production and process inspection - Sampling Inspection of mesh
基坑圍欄網(wǎng)框焊接工藝:采購(gòu)所需邊框管材—檢驗(yàn)壁厚長(zhǎng)度重量—---胎具制作和檢驗(yàn)—下料截?cái)?--焊接邊框—網(wǎng)片與邊框焊接-—網(wǎng)框與立柱結(jié)構(gòu)安裝檢驗(yàn)—批量焊接生產(chǎn)—過(guò)程檢驗(yàn)---大貨清點(diǎn)抽檢---半成品清點(diǎn)或倉(cāng)儲(chǔ)。
Welding process of fence net frame of foundation pit: purchase the required frame pipes - inspect the wall thickness, length and weight - mould production and inspection - blanking and cutting - weld the frame - welding between mesh and frame - installation inspection of net frame and column structure - batch welding production - process inspection - bulk inventory and sampling inspection - inventory or storage of semi-finished products.
基坑圍欄立柱制作工藝:采購(gòu)所需尺寸的鐵管—檢驗(yàn)壁厚長(zhǎng)度重量—胎具制作和檢驗(yàn)----下料截?cái)?mdash;折彎成型---焊接邊耳----立柱邊耳尺寸檢驗(yàn)(或與網(wǎng)框的結(jié)構(gòu)安裝)—批量焊接—過(guò)程抽檢—大貨清點(diǎn)或倉(cāng)儲(chǔ)。
Manufacturing process of foundation pit fence column: purchase of iron pipe of required size - Inspection of wall thickness, length and weight - mould making and inspection - blanking and cutting - bending forming - welding lug - Inspection of column lug size (or structural installation with mesh frame) - batch welding - process sampling inspection - bulk goods counting or storage.
以上就是臨邊護(hù)欄http://m.syaan.cn為大家介紹的內(nèi)容,感謝您在百忙之中查看我公司的信息內(nèi)容,如果您想要了解的更多,歡迎您來(lái)電進(jìn)行咨詢(xún)!
The above is the edge guardrail http://m.syaan.cn Thank you for checking the information of our company in your busy schedule. If you want to know more, you are welcome to call for consultation!